Six representative screens from a working FactoryView deployment. Same software you'd run in your plant, with synthetic data filled in for client confidentiality. Each screen is customized in production — the screens you'd run might be configured differently.
Synthetic data · no client identitiesConfigurable to your plantProduction-running components
View 01 Performance reporting
Performance by operator.
Cycle time against target, by operator and by line, sorted by efficiency. The conversation a supervisor has on Tuesday morning, in one screen.
Click any row in production to drill into hourly performance, units shipped, and downtime correlated with that operator's shift.
Performance
By operator
Drill-down
Configurable · by-line, by-cell, by-product
Plant 03/Performance/By operator · Shift 2
Live · 14:23
Today7d30dAll linesStampingAssemblyPack
Operator
Line
Cycle
Eff%
7d Trend
Status
JMOperator · J. Martinez
Line 4
28.9s/ 32s
110%
Above tgt
RPOperator · R. Patel
Line 4
30.4s/ 32s
105%
Above tgt
DLOperator · D. Liu
Line 3
32.1s/ 32s
100%
At target
SKOperator · S. Kowalski
Line 3
34.8s/ 32s
92%
Below tgt
AHOperator · A. Hassan
Line 2
38.2s/ 32s
84%
Coaching
MNOperator · M. Novak
Line 2
31.6s/ 32s
101%
At target
View 01 · Performance by operatorSynthetic data
View 02 Downtime analysis
Downtime — Pareto, not pity.
Stacked hourly downtime by reason code, paired with a sorted list of the top reasons. The thing you actually want to know when you walk into Wednesday's review.
Reason codes are configurable per plant. Operators tag downtime at the scoreboard kiosk; supervisors confirm or re-tag from this view.
Pareto
Reason codes
Configurable
Drill-down: by line, by shift, by reason
Plant 03/Downtime/Last 24h · All lines
Live · 14:23
24hShift7dStack by reason
Downtime by hour · stacked by reason
2h 14m total
Top reasons · 24h
01
Material wait
52 min
02
Changeover
38 min
03
Quality hold
24 min
04
Tool change
17 min
05
Operator break
8 min
06
Unplanned (other)
5 min
View 02 · Downtime drill-downSynthetic data
View 03 Standardized reporting
Shift report. Same template, every plant.
Plant-wide standardized format. Operators sign off at the kiosk; supervisors review and route. Prints cleanly, lands in your team's inbox at shift end.
Replaces the five different per-site spreadsheets that nobody else can read.
Printable
Sign-off
Auto-emailed
Per-plant or roll-up to multi-plant
Plant 03 · Line 4 · Stamping
Shift Report — Shift 2
Report SR-2026-0516-L4-S2
Date 16 May 2026
Shift lead R. Okonkwo
Units made
1,847/ 2,200
OEE
78.2%
Downtime
42min
FPY
96.8%
Issues this shift · 4 logged
09:42
Press 4 · upper die clamp pressure drop. Reset by maintenance, no scrap.
12 min
11:18
Material wait — coil cart routing delay between bays 2 and 4.
14 min
13:04
Quality hold on lot 24-A18 (surface mark). Routed to QC. Disposition pending.
8 min
14:11
Scheduled changeover from SKU-4421 to SKU-4485.
8 min
Notes for next shift
Coil routing issue (11:18) likely to recur on next changeover. Maintenance has been briefed; recommend supervisor walk-through with cart operator before 22:00.
Shift lead · R. Okonkwo
Reviewed by · supervisor
View 03 · Shift report (printable)Synthetic data
View 04 Quality & samples
Quality holds — caught, routed, disposed.
Active holds, awaiting disposition. Each card carries the lot, the part, the reason, the quantity, and the responsible disposition path. New, in-routing, and dispositioned holds are visually separated by left-border color.
Configurable workflow: who can place a hold, who can release one, what happens to the lot in between.
Audit trail
Disposition
Configurable workflow
Tied to TWI, scrap, and customer notification flows
Quality/Active holds · Plant 03
12 open · 3 awaiting QC
All · 12New · 3In-routing · 6Dispositioned · 3
HOLD-2026-0517
2h ago · NEW
SKU-4485 · Lot 24-A18
Surface mark on outer flange, run of ~40 units. Pulled from Press 4 line at 13:04 by operator.
~ 40 units→ QC inspector
HOLD-2026-0516
4h ago · NEW
SKU-4421 · Lot 24-A17
Dimensional check failed on first-article. Awaiting full lot remeasurement.
~ 220 units→ Quality eng
HOLD-2026-0512
1d ago · ROUTING
SKU-3812 · Lot 24-A14
Customer-reported visual defect on receipt. Lot under investigation; root-cause analysis open.
~ 18 units→ Customer mgr
HOLD-2026-0509
2d ago · DISPO'D
SKU-4485 · Lot 24-A12
Released after rework + 100% visual inspection. TWI-118 invoked; full audit logged.
62 / 62 released→ Closed
View 04 · Quality holds queueSynthetic data
View 05 Temporary work instructions
TWI — versioned, signed, expiring.
Temporary work instructions, with version history, status, expiration, and named approvers. Every change is logged; every expiry triggers a review.
The audit trail your customer's auditor will eventually ask for. Built so you don't have to scramble when they do.
Equipment cards, sorted by status. Each card shows uptime, MTBF, last and next PM, and any open work orders. Click any card to drill into PLC tag history, fault log, and parts consumption.
PM schedules track to actual run hours from the PLC, not calendar time. So your next PM is when the equipment actually needs it.
PLC-aware
Run-hour scheduling
Work orders
Ties to spares inventory and procurement
Maintenance/Equipment · Plant 03
17 of 19 OK
All · 19OK · 17Warning · 1Down · 1
Press 4 · Upper die
EQ-P04-U · Stamping
Down
Down for
14min
Open WOs
2
Last PM · 02 MayMaint en-route
Press 2
EQ-P02 · Stamping
Warning
Uptime · 7d
94.2%
MTBF
86h
Last PM · 10 MayPM due · 2 days
Press 1
EQ-P01 · Stamping
OK
Uptime · 7d
98.6%
MTBF
128h
Last PM · 14 MayPM in 12 days
Assembly Cell 2
EQ-A02 · Assembly
OK
Uptime · 7d
99.1%
MTBF
214h
Last PM · 07 MayPM in 19 days
Pack Line 1
EQ-PK01 · Pack
OK
Uptime · 7d
97.4%
MTBF
96h
Last PM · 11 MayPM in 8 days
Weld Robot 3
EQ-WR03 · Assembly
OK
Uptime · 7d
99.8%
MTBF
342h
Last PM · 02 MayPM in 24 days
View 06 · Equipment healthSynthetic data
See it customized to your plant.
Every screen above is configurable. The version you'd run in production is built around your reason codes, your lines, your shift patterns, and your sign-off rules.